§ 9-88. Classification of meter service for purposes of permits.  


Latest version.
  • (a)

    For the purpose of regulating the issuance of permits, each recording watt-hour meter and all main feeder wires, sub-feeder wires and branch circuit wires connecting to same shall be construed as one (1) meter service. A separate permit shall be obtained for work performed on each such meter service.

    (b)

    When multiple unit buildings of four (4) or more units with multiple like units and services are permitted, one (1) permit will be required, in lieu of the number of unit meters. The total fees will be added together for all units, and final inspection approval will be for all units only at the same time.

    (c)

    When electrical work is permitted with no metered service, the permit fees are to be based on the total cost of all labor, materials, and fixtures installed.

(Code 1965, § 6-363; Ord. No. 86-6, § 13, 3-17-86; Ord. No. 97-27, § 8, 12-30-97; Ord. No. 2001-26, § 1.W., 12-18-01)