§ 9-576. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
En route storage site shall mean a transit site for a structure which is being moved under a move permit from its original location to a permanent location or temporary storage site. (An "en route storage site" and a "temporary storage site" are mutually exclusive.)
Move permit or permit to move shall mean a permit issued by the division of building safety after the zoning and transportation departments have approved (with or without conditions) an application to move a structure, which permit allows the applicant to move the structure after the division of building safety has affixed tags to the structure.
Structure shall mean any building for which a person would have to obtain a building permit from the division of building safety to erect or construct. The word "structure" does not mean a "manufactured building" or a "mobile home," as those terms are respectively defined in the Florida Manufactured Building Act of 1979 [F.S. § 553.35 et seq.].
Temporary storage site shall mean a site which serves as a holding site for a structure which is being moved from its original location when a permanent location has not yet been determined. A "move permit" is required to move a structure to a temporary storage site. (A "temporary storage site" and an "en route storage site" are mutually exclusive.)
(Code 1965, § 6-776; Ord. No. 88-10, § 6, 9-12-88; Ord. No. 97-27, § 27, 12-30-97; Ord. No. 2001-26, § 1.SS., 12-18-01; Ord. No. 2005-13 , § 1(AA, HH), 10-4-05)