§ 21-237. Restoration and cleanup.  


Latest version.
  • (a)

    The permittee shall insure that all monuments, section corners and property marks shall be protected and perpetuated in accordance with Appendix P.

    (b)

    The permittee shall be liable for all damage, injury or loss to persons or property of any character arising from or resulting from any act of commission, omission, neglect or misconduct in the performance of work by the permittee, his employees or agents. The permittee shall be further liable for damage, injury or loss to persons or property arising from or as result of defective work or materials.

    (c)

    Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored in a manner acceptable to the county. Sod that is removed shall be replaced with the same type. Unsodded areas shall be graded and then seeded and mulched in accordance with the county road construction specifications. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with equal types and sizes. Grassing and mulching operations are to begin immediately after construction/installation has been completed. All trees and/or shrubbery damaged or disturbed during construction shall be replaced by the permittee at his expense, as directed by the county engineer. Any plantings by property owners shall be removed and replaced to the satisfaction of the county engineer and property owner. All debris shall be removed by the permittee at his expense.

    (d)

    Existing utilities that are damaged, destroyed or temporarily removed by the permittee shall be replaced or repaired by the permittee at the direction of the owner with no expense to the county or owner.

    (e)

    The permittee shall insure that work site cleanup and property restoration follows construction/installation operations without delay. In order to maintain an acceptable site, debris and waste material shall be removed from the site immediately and daily trenching shall be coordinated to provide a minimum overnight trench opening. Site maintenance, along with ongoing cleanup and final property restoration shall be subject to the direction and approval of the county engineer.

(Right-of-Way Utilization Regs., § XVIII)